无码精品一区二区三区四区爱奇艺_69堂亚洲国产日韩精品无码专区成人妻中文字幕一区二区三区在线久久久久_欧美MV日韩MV国产网站

Welcome to [ Wuxi Funecon Precision Mould Plastic Co., Ltd. ] website! Home| Sitemap| Email
Moulding Your Future

Enquiry:

138-6185-1071

138-6185-1071

What are the main aspects of injection mold cooling water leakage

Injection mold cooling water leakage is a frequent occurrence, for many reasons, mainly in the following aspects:
The most occurs at the joint of the mold cooling water pipe. If water leakage is found, the sealing tape should be wound around the thread of the pipe joint and then tightened.
2, Due to long-term molding conditions, the waterproof ring inside the mold will be damaged, and the O-shaped waterproof rubber ring will easily harden and crack, resulting in water leakage. Some poorly installed waterproof rings can also cause seal failure. It is generally necessary to regularly check the installation position and sealing performance of the seal.
3, The hole wall of the cooling water hole is broken. This often happens when a new mold is tried. The wall thickness of the design is sufficient, but the hole wall is broken due to machining errors or post-processing. In most cases, leaking water holes can no longer be used.
4, Regularly repair the heating pipe and decompression pump and use. The heating tube is an effective heat transfer element and is very effective for core cooling of deep and deep structures. In the area where the cooling water is easy to pass, a one-way heating pipe is provided to reduce water leakage. In addition, the use of a vacuum pump to pump cooling water is also a method to prevent leakage of cooling water.
5, maintenance of the cooling water hole. It is easy to form scale in the cooling water hole, which hinders heat transfer. In severe cases, the water path is blocked and needs regular maintenance. For straight water holes, an iron bar that is 0.5 mm smaller than the diameter of the cooling water hole can be inserted and tapped with a hammer to remove scale and rust. For the cooling water pipe buried in the mold, the mold should be disassembled to remove rust.
After the inspection, the water leakage test should be carried out. The hand pressure pump is used to fill the water hole with water, and it is kept at a pressure of 2 MPa for 5 minutes. It is judged whether the water hole leaks by observing whether the water pressure is lowered. The water leakage can be blocked by mechanical fastening using elastic materials such as rubber and cork, and the room temperature curing type silica gel can be tried as a sealing material.
2018/08/02 10:11:16 6611 次

Hot News

Copy right of the 2018 Wuxi Funecon Precision Mould Plastic Co., Ltd. All Rights Reserved

方跃教授:AI若无法规模化落地,市场或重演2000年互联网泡沫|Alpha峰会 资本市场并购重组的十大趋势|资本市场 从“一根丝”到“一件衣”,新乡经开区打造百亿级生物基纤维集群|经开区 英伟达盘前领涨美股科技七巨头 人工智能股从回调中反弹 2025年中国水下阀门行业产业链、市场规模、竞争格局及前景展望:保障海洋能源开采安全自主,加快水下阀门国产化进程[图] 中信保诚基金吴振华:在科技浪潮的“两极”中,践行一种“不焦虑”的投资 朝中社刊文:必须遏制日本拥核野心 卓然股份曝出IPO募资违规案 资金竟流入体外资金池 公司及实控人被立案调查|卓然 央行等三部门联合立规,这些场景必须支持现金支付|规定 天津港发展附属焦炭码头公司购买四台门座式起重机|天津港发展 世名科技:截至2025年12月10日股东人数为17751户|世名科技 派拓网络宣布与谷歌云达成数十亿美元合作协议 AI驱动普惠理财创新,网商银行获“金理财”2025年度财富管理品牌奖 中老铁路开通运营满四年——“黄金大通道”释放沿线发展潜能 中国国家数据局发布第四批公共数据“跑起来”示范场景 菲律宾延长食糖进口禁令至2026年12月 2026年计算机行业年度策略:从“+AI”到“AI+”,AI巨轮破浪前行(附下载)|计算机行业 学习·知行丨创新驱动,久久为功 美银:维持美的集团“买入”评级 目标价92.1港元|美的集团 沃尔玛中国业务战略升级再进一步山姆中国新一号位到位 奥赛康:公司聚焦主营业务|奥赛康